In this project we built two 100 m x 100 m oil well leases. Interesting in this construction were the 7 m cuts that were required. In addition to the lease building,
access roads were constructed to ensure safe and stable entry to the site.
The leases were cleaned up to our high quality standards after construction, and strict adherence was maintained to our environmental policies.
The project was done on time and on target in a safe manner without any recordable incidents.
Husky Energy: Mervin, Saskatchewan Area
In order to accommodate a larger required area for tanks and containment, several tear-drop leases were extended. The requirement to extend these sites in various locations
of diverse terrain was an interesting element of this project.
Crew Energy: Killam, AB area
Interesting in this project was the minimum disturbance area and reclaiming due to sensitive environmental issues. Adherences to our strict environmental guidelines were
required to ensure that a minimal footprint was left behind.